January 2021 — confirmation of the validity of the certificates of compliance with ISO 45001: 2018 and ISO 14001: 2015 based on the results of the supervisory audit of the Integrated Occupational Safety Management System and the Environmental Management System for compliance with the requirements of the specified international standards.
January 2021 — launch of a turbo generator with a new stator of “Electrotyazhmash” manufacture into commercial operation at the Kaiga-3 NPS in India.
March 2021 — participation in the "Kharkiv Prom Days 2021" Exhibition-Forum.
March 2021 — signing of memorandum with a Czech company on participation in the implementation of the Iraqi power station renovation program.
April 2021 — obtaining a certificate of accreditation from Research, Design and Technological Institute of Railway Transport for the right of maintenance and repair of traction electrical equipment installed in the rolling stock of JSC "Ukrainian Railways".
June 2021 — approval of the Plant by SE “NNEGC “Energoatom" as a supplier of this company until 2026.
July 2021 — celebration of the 75th anniversary of “Electrotyazhmash”.
August 2021 — State Enterprise "Plant "Electrotyazhmash" was reorganized into a Joint Stock Company "Plant “Electrotyazhmash”.
January 2020 — participation in the project of the in-depth retrofitting of 2ТЭ10 diesel locomotive, together with the Nikolayev Diesel Locomotive Repair Plant.
March 2020 — implementation of the most modern standard of the Occupational Safety Management System - ISO 45001:2018.
May 2020 — election by the primary trade union organization of the Plant of Dmitriy Nikonenko as the Chairman of the Trade Union Committee, and Olga Afanasyeva as the Deputy Chairman.
June 2020 — manufacture of the 1000th DC exciter ВС-650ВУ2 during the independence period of Ukraine.
August 2020 — successful conducting of the 2nd Supervisory Audit of the Enterprise Quality Management System for compliance with the requirements of the international standard ISO 9001:2015.
September 2020 — participation in the project of the first Ukrainian in-depth retrofitting of ТЭМ2 diesel locomotive in a joint project with the Poltava Diesel Locomotive Repair Plant.
October 2020 — completion of equipment supplies as a part of the reconstruction at Power Unit No. 18 of the Kanev HPS.
November 2020 — launch of reconstructed hydroelectric generating set No. 6 with the “Electrotyazhmash”-make hydro generator into commercial operation at the Kiev PSPS.
January 2019 — obtaining OHSAS 18001: 2007 and ISO 14001: 2015 certificates for a period of up to three years.
March 2019 — signing of a contract for the reconstruction of hydrogenerators st. No. 3, 4 of the Kremenchug hydroelectric power station of the company «Ukrhydroenergo».
September 2019 — obtaining the title «Honored Machine Builder of Ukraine» by the head of the anchor workshop Alexey Sotnikov.
November 2019 — manufacturing of the 1000th synchronous traction generator GS515UHL2.
November 2019 — transfer of the plant to the management of the State Property Fund of Ukraine, start of the privatization of the enterprise.
November 2019 — obtaining the title «Honored Machine Builder of Ukraine» by the Deputy Chief Designer of the Research and Design and Development Complex of Traction Electrical Equipment Sergey Grivin
December 2019 — rewarding with an honorary diploma of the Kharkov city council of the plant's labor collective.
December 2019 — appointment of acting Director Viktor Busko.
May 2018 — Aleksey Vakulenko, chief designer for hydrogenerators and KMPT, received the State Prize of Ukraine in the field of science and technology in 2017.
June 2018 — obtaining a certificate of conformity for the GIR101BU1 subcar generator.
August 2018 — manufacturing of the 1000th electric motor ED133KUHL1.
September 2018 — development of a new generator GS-525AUHL2 for «BelAZ».
November 2018 — at the Rogun hydroelectric station in Tajikistan, the first hydraulic unit with a capacity of 600 MW was launched with the «Electrotyazhmash» hydro generator.
November 2018 — signing of a contract for the delivery of the stator of the three-phase synchronous turbogenerator TGV-250-2PT3 and spare parts for it to the «Kaiga» NPP (India).
January 2017- the plant manufactured the 3000th generator of traction DC GP-321 U2, which is manufactured since the 90th of the last century.
March 2017- "Electrotyazhmash" signed a contract for the manufacture of hydroelectric generators for the Kiev PSHP ("Ukrhydroenergo").
April 2017- a contract was signed with Ukrhydroenergo for the development and delivery of a hydrogenerator-engine for the second stage of the fourth hydroelectric unit of the Dniester PSP.
June 2017- the company signed a contract for the development and supply of a turbo-generator in a tropical version for the TPP "Siddirganch."
October 2017- the 3000th DC electric traction electric motor EAF810U1 for railway transport was produced.
July, 2016 — Plant “Electrotyazhmash” turned 70 years.
October, 2016 — Construction of the world’s highest rock-fill dam of Rogun Hydroelectric Power Station began in Tajikistan. Electrotyazhmash’s specialists take part in this construction. Their high-quality work noted by Emomali Rahmon, the President of Tajikistan.
December, 2016 — The first inspection audit of labor protection management system and environmental management system took place at Electrotyazhmash. The conclusion of Bureau Veritas Certification (Ukraine) specialists confirmed that the above systems of the Plant meet the requirements of international standards ISO 14001 and OHSAS 18001.
December, 2016 — The audit of financial statements conducted by international audit company KPMG was completed at Electrotyazhmash, being the first one in the history of the Enterprise. According to the findings of the audits for 2014 and 2015, the Enterprise obtained conditionally positive opinion of the auditors.
February, 2015 — Plant Electrotyazhmash got a certificate of compliance with the international standard of railway industry IRIS
September, 2015 — Electrotyazhmash passed the audit of quality management system conducted by the certification body "SERTTSENTR ACU" HF "SERTATOM" and confirmed the compliance of the quality management system with the requirements of "Energoatom" for the period up to 2020.
September, 2015 — The most high-power turbogenerator ever - TGV-550-2MU3 for Ekibastuz SDPP-1 (Kazakhstan) - was manufactured.
April, 2014 — Electrotyazhmash shipped turbogenerator TGV-325 for the modernization of the power unit №5 at TPP "Aksu" (Kazakhstan).
November, 2014 — The Plant completed production of the third generator-motor SVO 1255/255-40 UHL4 for Dnestrovskaya HPSPP ("Ukrhydroenergo"), the largest pumped-storage power plant in Europe.
March, 2013 — Vladimir Glushakov was appointed to the position of director of SE Plant Electrotyazhmash.
December, 2013 — The 2nd electrical power unit with a generator-motor produced by Electrotyazhmash was activated at Dnestrovskaya HPSPP, the largest pumped-storage power plant in Europe.
December, 2012 — Chief Designer on turbogenerators, hydrogenerators and large electrical machines A.P. Gruboy was awarded with Third Class Order of Merit.
October, 2012 — Chief Designer of the traction electrical equipment complex V.A. Ivanov was awarded with Third Class Order of Merit.
September, 2012 — for the first time modern material, vetronit, was applied for rewedging of the stator winding of the hydrogenerator-motor SVO 1255/255-40UHL4.
July, 2012 — recertification audit of quality management system of the enterprise for conformance to the requirements ISO 9001:2008 was passed by SE Plant Electrotyazhmash. .
May, 2012 — employees of SE Plant Electrotyazhmash, Deputy Chief Designer Konstantin Kobzar and Deputy Head of Estimated-theoretical Department Lev Haymovich were awarded State prize of Ukraine.
August, 2011 — a traction aggregate A723AU2 for the first Russian diesel locomotive with the asynchronous traction drive 2TE25A Vityaz was produced and shipped to JSC Kolomenskiy plant for completing of the diesel-generator for the diesel locomotive.
September, 2010 — the hydrogenerator type SV 866/70-52M rated 23 MW was tested and accepted in the industrial operation for HPP Varstyhe in Georgia.
April, 2010 — the main sample of turbogenerator type TA-6-2MU2 of turbogenerators series with water cooling was produced and tested.
January, 2010 — the high-powered generator motor type SVO 1255/255-40 rated 421 MW was started in operation at Dnestrovskaya HPSP.
August, 2009 — an authorial registration certificate of computer program "Computation Evolventa 2009" was obtained, the designers of which are personnel of SE plant Electrotyazhmash.
February, 2007 — the traction motor DC EAF 153 for passenger electric EP2K PJSC Kolomensky Zavod was produced.
December 2006 — the first traction electrical motor for electric locomotive type 2ES6 for the Urals plant of the transport machine-engineering, the tender for supply of which was won by the plant from the leading Russian enterprises: Lisva association Privod etc., was produced.
August, 2004 — a set of modern traction equipment for the first Ukrainian passenger main line diesel locomotive type ТE150U1, manufactured by JSC KC Luganskteplovoz, was designed and manufactured.
December, 1970 — a turbogenerator rated 1000 MW was manufactured at the plant.
July, 1966 — the plant was awarded the order of Lenin for achievement of high technical-economical indices of works.
February, 1961 — according to the Decree of the Ministers Council of the Ukrainian SSR the plant had changed the name and began to be called V.I. Lenin Kharkov Plant Electrotyazhmash.
July, 1959 — the enterprise got a new name - plant "Electrotyazhmash".
December, 1958 — the first turbogenerator rated 200 MW was produced, which still works at Northern SDPP (Azerbaijan).
December, 1947 — the first traction electrical motor type DK 304B for mainline diesel locomotive TE-1 was produced.
April, 1946 — the Decree on building of diesel locomotive electrical equipment plant on the basis of auto-repair shops in Kharkov. .